Revelstoke Attractions:
Revelstoke Hydro Dam
Come and explore one of North
America’s largest and most
modern hydroelectric
developments. Revelstoke Dam is
the second largest generating
facility in B.C., with enough
energy to power 747,600 homes a
year!
Our multi-level, newly updated
visitor centre features new
interactive displays, exhibits
such as “Putting Water to Work”,
“A Powerful Partnership”, and
the construction of Revelstoke 5
– the latest edition.
Discover the story of power
generation through the Penstock
Gateway walk- through tour.
Take an elevator ride to the dam
crest lookout located atop the
massive 175 meter high concrete
dam.
Learn about conservation and how
you can play a part in meeting
the growing electricity needs of
our province.
Open daily from
June 1 to September 30 from 10
a.m. to 5 p.m.
Self-guided tours only. The
Gift Shop has unique items and
wide selection of refreshments.
The facility is fully wheelchair
accessible
Just a few minutes away, located
about 5 km north of Revelstoke
on Highway 23 North.
For more information, visit the
Revelstoke Hydro Dam
website or call 250 814-6697. |